Best Of
View Parent on top of the card
Hi.
In Card View you can see the parent element in each card, as you can see in the bellow image.
This information is missing in the cards of the Board View and is very usefull.

Re: Setting a date column to the 1st of the Month
Hi,
To get the first day of the current month you can use this formula:
=TODAY(1 - DAY(TODAY()))
Level filter in Board View
In Card View we can view cards of the Level 1, 2, etc instead in Board View we can't. This feature is very useful because we can save in the same Sheet Projects and Task each of them has, for example, diferente status.

Include a description in each state for a Board View
Hello.
One of the reasons why applying the Kanban Framework requires less team management time is because it establishes explicit policies on how to work and, above all, what a task must accomplish in order to change status.
For this reason, it would be necessary to have a space where to write a description in each state in order to indicate these explicit policies.
Furthermore, this description should be visible from the Board View and Card View to facilitate its consultation during task management.

Introduce the concept of subcolumns in card/board view "Doing / Done"
Hello.
In order to make a proper management following the Kanban Framework it is necessary to distinguish, for each state, which jobs are under development and which, in that state, are finished waiting to be moved to the next state.
This is the way the Framework helps to change from a push management, where each team sends work to the next without knowing its capacity (and therefore generating bottlenecks, bottlenecks and bottlenecks) to a pull management where each team manages its own capacity allowing to find the bottlenecks in order to address them and thus improve the performance of the entire flow.
Thus, the proposal is that each state in the dashboard can have a ‘Doing’ and a ‘Done’ sub-column. Jobs that are in progress will be in ‘Doing’ and those that are finished for that state will be moved to the ‘Done’ sub-column.

Add support for WIP limits in card/board view (maximum cards allowed per column or lane)
Hi.
The Kanban framework needs the limitation of WIP in order to be applied so that teams can achieve amazing results.
The WIP limit sets the maximum number of cards a Column or Lane can have. This is how the workflow is managed.
There are 2 ways to implement it, the first one is that if the limit has already been reached, it does not allow to add another card. The second is that if the limit is exceeded, the column is marked with an eye-catching background or in some other way to indicate that the limit has been exceeded.
It would be the same for the lanes.
Also, if a column is subdivided into ‘Doing’ and ‘Done’, ideally the WIP limit should be at the global column level and affect all the cards between the 2 sub-columns.

Rename “lane” to “column” in card/board view
In Kanban Framework and in most tools what you call ‘lane’ in the Dashboard view is called ‘column’. This change may achieve a smoother adoption of your tool for new people. In addition, it will facilitate communication between people using Smartsheet and those familiar with the Framework or Kanban boards.

Re: Custom Visualizations in Card View: horizontal rows & swim lanes
This is exactly what is needed! Thanks!
Re: Custom Visualizations in Card View: horizontal rows & swim lanes
This is a very important feature to have! We need horizontal swimlanes!